Practise for the 2391 inspection and testing exams.
Revision cards and mock exams timed like the real multiple-choice tests, for the City & Guilds 2391-50, 2391-51 and 2391-52. Try eight real questions below, then start free. No card details.
Written and reviewed by Tom S · Level 2 and Level 3 qualified; holds the 18th Edition · Last reviewed 11 October 2026
Try 8 inspection and testing questions
Real questions from electriQual on continuity, readings, test instruments and what to retest after a fault. Pick your answer, then open it to check.
-
from "Why continuity is first"
What do the R1+R2 readings get used for later?
- AThe insulation resistance reading
- BThe RCD trip time
- CThe expected Zs for that circuit
- DThe PFC at the origin
Show the answer
C. The expected Zs for that circuitYour R1+R2 figures feed straight into the Zs figures later.
-
from "Why continuity is first"
What does ring continuity actually prove?
- AThat the ring is a complete ring, not broken or crossed over
- BThat the insulation is sound
- CThat polarity is right at every socket
- DThat the RCD will trip
Show the answer
A. That the ring is a complete ring, not broken or crossed overRing continuity proves the ring is actually a ring before you judge anything else.
-
from "Things that distort a reading"
R1+R2 on a radial feeding a bathroom was tested twice. Which is the circuit's own R1+R2?
R1+R2 on a bathroom radial Supplementary bonding Reading (Ω) Connected 0.06 Disconnected 0.45 The installation was isolated before the bonding was disconnected.
- A0.06 Ω, with the bonding connected
- B0.26 Ω, the average of the two
- CNeither, the bonding has to stay connected for a valid reading
- D0.45 Ω, with the bonding disconnected
Show the answer
D. 0.45 Ω, with the bonding disconnectedBonded metal pipework is the usual source of a parallel earth path, and a parallel path takes some of the test current and pulls the reading down. Disconnecting the supplementary bonding gives you the true value, 0.45 Ω. It is reconnected afterwards.
-
from "When a test fails"
A test fails part way through a sequence. Once the fault is rectified, what has to be retested?
- AThe failed test only
- BThe failed test and any earlier test the fault could have affected
- CThe whole sequence from the beginning
- DOnly the tests that come after the failed one
Show the answer
B. The failed test and any earlier test the fault could have affectedThe failed test is carried out again, and so is any earlier test the fault could have affected.
-
from "The instrument for each test"
Installation test instruments are built to which standard series?
- ABS EN 61557
- BBS 7671
- CBS EN 60898
- DBS 1363
Show the answer
A. BS EN 61557All of these instruments are covered by the BS EN 61557 series.
-
from "Instrument calibration"
A tester is dropped from a step ladder three months after its last calibration. What should happen to it?
- AIt can be used until its annual calibration falls due
- BIt only needs a spot check against a known resistance
- CIt goes for calibration before it is relied on again
- DIt can be used provided the readings look sensible
Show the answer
C. It goes for calibration before it is relied on againAn instrument that has been dropped goes back for calibration, whatever the date says.
-
from "Instrument calibration"
What is the legal status of a twelve month calibration interval?
- AIt is required by the Electricity at Work Regulations
- BIt is set out in BS 7671
- CIt is required only for instruments used on certification work
- DIt is the accepted industry baseline rather than a stated legal interval
Show the answer
D. It is the accepted industry baseline rather than a stated legal intervalAnnual is the baseline, but no regulation names twelve months as the rule.
-
from "The earth fault loop path"
Where does the earth fault loop start and finish?
- AThe consumer unit
- BThe transformer winding
- CThe main earthing terminal
- DThe earth electrode
Show the answer
B. The transformer windingThe loop always starts and finishes at the transformer winding.
These come from two of the five free modules, Why the test order works and Earth fault loop paths. With a free account you get their full cards, diagrams and module tests.
The earth fault loop path
The loop is the full circle fault current travels when a line conductor touches earthed metalwork. This is the diagram from the electriQual portal, exactly as learners see it, and it's in a free module.
- Five steps, in orderOut from the transformer winding to the fault, through the metalwork, back along the CPC (circuit protective conductor) and the earthing arrangement, and into the winding again.
- What changes between systemsOnly the way back. The way out is the same every time.
- One of 52 diagrams for the 2391With a pass you get every diagram tagged to Initial Verification or Periodic Inspection, alongside the cards they belong to.
What electriQual has for the 2391
Pick L3 Initial Verification or L3 Periodic Inspection as your exam in the portal and every module filters down to what's on it.
Free account
Five full modules to keep, with no card details and no time limit. Four have 2391 cards:
- Why the test order works9 cards
- Earth fault loop paths5 cards
- Equipment classes4 cards
- Circuits and resistance1 card
- Review of the cards you get wrong✓
With a pass
From £9.99 · one payment, never renews- Every 2391 card and diagram247 · 52
- All three 2391 mock exams3
- Test-result scenarios and worked calculations✓
- Every other exam as well✓
A pass is for revision only. It doesn't include your 2391 exam booking or fees, which you arrange with your centre.
2391 questions, answered
Anything else? Email support@electriqual.com.
Is this the official City & Guilds 2391 exam?
No. electriQual is independent revision. Its 2391 mocks copy the number of questions and the time limit in City & Guilds' qualification handbooks, but every question is written by electriQual from its own revision cards.
What's the difference between the 2391-50, 2391-51 and 2391-52?
The 2391-50 covers initial verification and the 2391-51 covers periodic inspection. The 2391-52 covers both, so its multiple-choice test is longer: 60 questions in 2 hours, against 40 questions in 1 hour 30 for the other two. electriQual has a mock timed like each one.
What is the 2391 pass mark?
About 75% on each of the three multiple-choice tests. electriQual's 2391 mocks mark you against 75%.
Can I take books into the 2391 exam?
Yes. The multiple-choice tests are open book, with BS 7671, the On-Site Guide and Guidance Note 3. Practise with your own copies to hand, and check with your centre exactly what you can take in.
Do the mocks cover the practical assessment?
No. Each 2391 qualification also has a practical assessment, arranged by your centre. electriQual's mocks cover the multiple-choice test only.
Does a pass pay for my 2391 exam?
No. A pass covers electriQual revision only. Your exam booking and fees are arranged with your centre.
Can I try it for free?
Yes. Make a free account and five full modules are yours to keep, with no card details. Four of them have 2391 cards, including Why the test order works and Earth fault loop paths.
Go into the 2391 knowing why.
Five full modules are free. See if it suits how you revise.
Also sitting the AM2? Try 8 AM2 knowledge test questions · Starting with the 2392-10? Try 8 2392-10 questions · Doing Part P? Try 7 2383-10 questions · Sitting the 18th Edition? Try 8 18th Edition questions